Challenge
The customer had experienced sinking foundation slabs on their workshop access points. They explored several different options for repair but after researching the VESTA Foundation Solutions team, they discovered raising the concrete would be a cost effective and long term solution to concrete removal or new flatwork.
Solution
The VESTA team installed a foam injection system to raise and protect the concrete rather than replacing. The installation took approximately 4 hours start to finish. All the joints we sealed to protect cracks in the concrete from getting worse.
Project Summary
Project Coordinator: Josh Nation
Installer: Adam Blake